New York, NY
During the construction of the museum building on the site of the World Trade Center Memorial site, the unusually shaped custom concrete walls were not poured according to the design. This would have resulted in the exterior cladding that was fabricated for the project not fitting over the walls tightly. Lanmar scanned the construction and provided a 3D model based on which new exterior panels were designed that fit the incorrectly poured walls.